Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4024287 |
|---|---|
| Organisation Name | Himachal Pradesh Agriculture Development Society |
| Tender Brief | Corrigendum : Construction of Flow Irrigation Scheme Champa Pulug, G.p- Jungra, Tehsil- Churah, District-chamba (h.p) |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 106063.00 |
| Estimated Cost | 7356300.00 |
| City | Palampur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismentling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground with in 50 meters lead as per direction of engineer in charge. | 96.62 | Cum |
| 2 | Cutting in earth work and disposal of excavated earth up to a lead of 20 mtrs.Chiselling work in soft rock as per entire satisfation of engineer in charge. | 1.84 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms,lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavted soils as directed, within alead of 50 m in ordinary rock all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 43.79 | Cum |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 95.90 | Cum |
| 5 | Excavating trenches of required width for pipes, cables, etc including excavating for sockets and dressing of sides, ramming of bottoms, depth upto 1.5m, including getting out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc and disposing of surplus excavated soil as directed, within a lead of 50m. pipes, cables etc. exceeding 80mm dia. but not exceeding 300mm dia. complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 4553.00 | Rmt |
9 Days Left