Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4024316 |
|---|---|
| Organisation Name | Himachal Pradesh Agriculture Development Society |
| Tender Brief | Corrigendum : Construction of Tube Well Scheme At Chabuan, G.p- Jhonkaratiyal, Tehsil- Jawali, District- Kangra (h.p) |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 94154.00 |
| Estimated Cost | 6165380.00 |
| City | Palampur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanically means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 1.50 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 114.17 | Cum |
| 3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 mtr, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposite layers by ramming, watering, etc and disposing of surplus excavated soil as directed within the lead of 50 mtr, complete in all respect and to the entire satisfaction of engineer-in-charge. | 4992.00 | Rmt |
| 4 | Extra allowance for formwork in concrete lining | ||
| 5 | In bed within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 0.75 | Cum |
9 Days Left