| Tender ID | 4598763 |
|---|---|
| Organisation Name | Himachal Pradesh State Electricity Board Limited |
| Tender Brief | Corrigendum : Tender For Detailed Investigation Dismantling Inspection Testing And Root Cause Analysis Of Generator Vibration Of 3 Mw 6.6 Kv 500 Rpm Hydro Generator No1 At Binwa Power House Under Baner Power House Division Hpsebl Jia |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 25 Jun, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 9700.00 |
| Estimated Cost | 970000.00 |
| City | Palampur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Site visit and preliminary assessment , Mobilization of engineers and instruments , Method statement , risk assessment and work planning , vibration spectrum analysis , phase analysis , bearing vibration measurements. | 1 | JOB |
| 2 | Opening generator covers and auxiliaries , coupling dismantling Rotor withdrawal using crane , rotor stand preparation and securing | 1 | JOB |
| 3 | Rotor run-out measurement shaft journal inspection, rotor insulation resistance test , pole drop test, rotor NDT (MPI/DPI), Air gap Eccentricity checks, rotor balancing assessment, surge comparison. | 1 | JOB |
| 4 | Journal measurements, Bearing clearance measurement , white metal inspection , oil analysis , bearing pedestal inspection laser shaft alignment , soft foot check, Foundation bolt inspection , grouting condition survey , Resonance assessment , inspection of pilot exciter and main exciter and submission of Final report | 1 | JOB |