Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4417279 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Welcome Maint Periodical Services Certain Repairs To Offrs Md Accn And Repair Maint Works In Zone C At Palampur Mil Stn |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 0.00 |
| City | Palampur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Preparation of old plasteres/unplastered wall surface including brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of white washing, complete all as specified and directed. | 4,900.00 | Sqm |
| 2 | Preparation of old plasteres/unplastered ceiling surface including brooming down or steel wire wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of white washing, complete all as specified and directed. | 2,000.00 | Sqm |
| 3 | Preparation of old plasteres/unplastered wall surface including brooming down or steel wire brushing, scraping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of distemper oil emulsion, with sponge rollers, complete all as specified and directed. Note : - 25 % of material shall be deposited in MES store at every qtrs before commencement of works and shall be issued to contractor as per requirement. | 17,950.00 | Sqm |
| 4 | M&L for applying a coat of 2 mm thick layer wall putti over wall ,complete all as specified and directed. | 800.00 | Sqm |
| 5 | M&L for complete removal of existing treatment and preparation old wall surface and applying two coats of distemper oil emulsion over a coat of primer, with sponge rollers, over and including wall care putty of 2 mm thickness, complete all as specified and directed. Note : - 25 % of material shall be deposited in MES store at every qtrs before commencement of works and shall be issued to contractor as per requirement. | 2,500.00 | Sqm |
6 Days Left