Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4072058 |
|---|---|
| Organisation Name | HP Krishi Vishva Vidyalaya |
| Tender Brief | Repair -cum-renovation Of Old Milking Parlour, Deptt. Of Live Stock Farm, Covas, Cskhpkv, Palampur.(sh Providing And Laying Partition Wall, Cement Concrete Flooring, Wood Work Etc.) |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 05 May, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 5720.00 |
| Estimated Cost | 285999.00 |
| City | Palampur |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) including entire carriage of material within all leads & lifts. | 7.44 | Per cubic metre |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of any metre. All kinds of soil. including entire carriage of material within all leads & lifts. | 6.29 | Per cubic metre |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) including entire carriage of material within all leads & lifts. | 7.97 | Per cubic metre |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including entire carriage of material within all leads & lifts. | 3.36 | Per cubic metre |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete including entire carriage of material within all leads & lifts. | 11.10 | Per Square metre |
10 Days Left