Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4310897 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Repair Work On Nemichand Mali Ke Makan Se Jwaleswar Mahadev Mandir Road. (risk And Cost) |
| Last Date For Submission | 22nd Jun, 2026 |
| Opening Date | 23 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 2620.00 |
| Estimated Cost | 131000.00 |
| City | Pali |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201 By mechanical Means . In area of light jungle | 0.880 | P.Hect. |
| 2 | Filling pot-holes and patch repairs with open-graded premix surfacing, 20 mm with removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per Clause 503, back filling the pot holes with hot bituminous material as per clause 511 using bitumen mixed in hot mix plant 40-60 TPH capacity and carriage with all lead, compacting with 8-10 tonne smooth wheel roller, trunming & finishing the surface to form a smooth continous surface, all as per MORTH specification Clause 3004.2 | 600.000 | P.Sqm |
| 3 | Providing and laying granular sub-base material having P.I.not more than 6, including spreading in layers not exceeding 150 mm compacted thickness and consolidation by 8-10 tonne power roller to required camber and grade including cost of water and hire charges of machinery, including T&P with all lead (Compacted thickness to be measured).as per MORTH specification table 400-1, 400-2 For grading-II with CBR value not less than 25. to attain 100% proctor density.: | 200.000 | P.Cum |
18 Days Left