Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: National Institute Of Ocean Technology
Tender ID4417238
Organisation NameNational Institute Of Ocean Technology
Tender BriefCorrigendum : Rcc Pedestal For Placing Of 40 Feet Container For Niot Nemmeli Site
Last Date For Submission18th Jun, 2026
Opening Date18 Jun, 2026
Cost
Document Cost0.00
EMD40000.00
Estimated Cost0.00
Location
CityPallikaranai
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. 68.60Cum
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. 68.60Cum
3Supply & Filling with approved earth brought from outside (Good earth should free from rank vegetation, grass, brush wood , buliding waste etc )in trenches, plinth, sides of foundations etc. layers not exceeding 20cm in depth with consolidating each deposited layer by ramming and watering with hand roller of 2-3 tonn Capacity, lead up to 50 m and lift upto 1.5complete as directed by Engineer in charge27.00Cum
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 20 mm nominal size derived from natural sources) Note i)M-Sand Maybe used ii) RMC concrete should be used37.20Cum
5Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete all complete as per instruction of Engineer In - Charge.166.20Sqm