Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4630429
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repair/ Maint Of Certain Internal Road Of Zone-i And Ii In Aor Of Age B/r-i Under Ge Panagarh
Last Date For Submission15th Jul, 2026
Opening Date23 Jul, 2026
Cost
Document Cost500.00
EMD96000.00
Estimated Cost4800000.00
Location
CityPANAGARH
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area not exceeding 400 sqm, depth exceeding 50mm and not. exc 100mm deep (Scarifying include racking over and grading the broken up surface to the proper camber etc. as required) , complete all as specified and directed. 90.0010 Sqm
2M&L total 7.5cm thick (compacted thickness) Water Bound Macadum (WBM), with coarse aggregates of lime stone, Sand stone, Flint or Quartzite grading 2 (63 to 40mm size) or grading 3 (50 to 20mm size) spread, rolled and consolidated to required gradient and camber with 8 to 10 tonne power roller including preparation of unsurfaced WBM surfaces by brushing with wire brushes for removing caked, mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags to remove all loose dirt etc, complete all as specified and directed. [Note : (i) The finished surface tolerances to be as per Table 900-1 of MoRTH specifications for Road and Bridge Works 2013.(ii) Stack measurement of WBM materials brought at site shall be entered in MB as "Not to be abstracted" before payment.(iii) Approved certificate of mixing properties & proportion of qty of WBM materials shall be obtained from GE before execution of work. Payment shall be made only after adherence to the same alongwith submission of road roller register/ log book.(iv) Unit rate quoted by bidder shall inclusive testing charges as above & as per MoRTH & no extra claim against testing charges shall be entertained later on.] 112.0010 Sqm
3M&L & applying evenly a prime coat of Cationic Bitumen emulsion SS-1 conforming to IS : 8887 at a rate of application of 0.7 - 1.0 kg/sqm on surface of WMM/WBM as specified in Table 500-3 of MoRTH specification for Road and Bridge Works 2013, using mechanical sprayer after cleaning of existing surface, complete all as specified and directed. 90.0010 Sqm
4M&L premixed bituminous macadam over primed surface of road using paving bitumen VG-30 & temperature as per table 500-1 & 500-2 of MoRTH & as per IS : 73, laid/rolled by 8 to 10 tonne capacity roller and compacted to required gradient and camber (consolidated thickness 75 mm or less) including preparation of area before laying of Macadam with mechanical paver, binder contents of premixed macadam shall be 4% by weight of total mix (Design Mix), complete all as specified and directed. [Note : (i) Work shall be executed after approval of design mix of bituminous macadam by GE. (ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval. (iii) Payment shall be made to Contractor after submission of approved design mix, bitumen extraction report, Road Roller register & calibration report. (iv) Exact qty of binder to be used shall be ascertained by Design Mix. (v) Minimum 4% binder shall be used. However, in case more than 4% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept (vi) Course aggregate's physical property as per MoRTH table 500-6 & mixing of all aggregates as per table 500-7 of MoRTH. (vii) Unit rate quoted by bidder shall inclusive testing charges as above & as per MoRTH & no extra claim against testing charges shall be entertained later on.] 45.00Cum
5M&L Bituminous semi dense asphaltic concrete, 40mm consolidated thickness with minimum 5.5% binder with paving bitumen (VG-30) [Mix Design criteria as per SSR Part-I Clause 20.B.2.11, or as per MoRTH by Marshal method (Ref table 500-12 to 500-16)] coarse aggregate, fine aggregate, filler cement (OPC - 43 Gde) as per recommendation of design by weight of total mix from hot mix plant, rolled by with 8 to 12 tonne vibrating (tandom) road roller to confirm uniform surface and compacted to required camber and gradient including preparing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a tack coat of rapid setting cationic bitumen VG-10 conforming to IS : 73 at a rate of application of 0.3-0.4 kg/sqm on bituminous surface as specified in Table 500-5 of MoRTH Specification for Road and Bridge Works 2013, using mechanical sprayer, complete with mechanical paver, complete all as specified and directed. [Note : (i) Work shall be executed after approval of design mix of semi dense asphaltic concrete by GE.(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.(iii) Payment shall be made to Contractor after submission of approved design mix, Bitumen Extraction Report, Road Roller Register & Calibration Report.(iv) Exact qty of binder to be used shall be ascertained by Design Mix.(v) Minimum 5.5% binder shall be used. However, in case more than 5.5% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept.(vi) All testing charges shall include in unit rate quoted by bidder.] 484.0010 Sqm
15th Jul, 2026