Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4226919 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair And Strengthening Of Rcc Structure At Kendriya Vidyalaya Panagarh Under Ge Panagarh (deposit Works) |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 419200.00 |
| Estimated Cost | 34411000.00 |
| City | PANAGARH |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SCH A PART-I : B/R PORTION (WATER PROOFING TREATMENT TO ROOF & SUNKEN FLOOR) | ||
| 2 | STAGE-I Dismantling/taking down old existing unserviceable cement plaster loose/unsound weaken cement concrete of any description and in any position from existing external/internal surfaces of Reinforced Cement Concrete slab(Roof surface)/Reinforced Cement Concrete beam/ Reinforced Cement Concrete column/ Reinforced Cement Concrete lintels/Reinforced Cement Concrete facia/Reinforced Cement Concrete chajjas etc, (upto maximum height of 10 metres from natural ground level) with power driven pneumatic chisel and including removal of debris and washing down with water to remove dust, foreign items complete STAGE-II M&L applying two coats of epoxy based two component binder to bind old to new concrete chemical bond as per manufacturer's instructions and procedures complete STAGE-III M&L 25 mm thick average Plain Cement Concrete, 1:2:4 type B-0 (using 12.5 mm graded stone aggregate) as in padding concrete on roof over two coat of latex power at the ratio of 1:4:6 (Latex :Water: Cement) in a criss cross way complete [Note :- Second coat of latex is laid down minimum interval of 6-8 hours of first coat of latex and after second coat of latex immediate applied plaster work.] | 3135.00 | Sqm |
| 3 | item No. 1.001 Contd.... STAGE-IV M&L rendering 10mm thick on fair faces on roof surfaces of concrete surfaces in cement mortar 1:3 finished even and fair including using water proofing compound admixture as per manufacturer's instructions, complete [Note :- WPC will be measured and paid separately under relevant item of schedule, complete all as specified and directed.] STAGE-V M&L providing water proofing treatment with a layer of APP based polymeric membrane 3mm thick minimum weighing 3.60kg/sqm reinforced with polyester non wove fabric (wt. not less than 160 gms/sqm) shall be applied over one coat of cold bituminous primer @ 0.40 ltr/sqm (membrane shall be laid using butane torch sealing all joints etc), complete all as specified and directed. [Note: The over lap shall be of minimum 75mm in longitudinal direction and 100mm on transverse direction] STAGE-VI M&L one coat of UV resistant bituminous aluminium paint over APP membrane complete all as specified and directed. [Note : Work shall be executed through specialist applicator/ agency] | ||
| 4 | M & L as per following stages complete all as specified and directed: STAGE-I: Providing and laying water proofing treatment of sunken portion of WCs, bathroom etc by applying cement slurry with acrylic based modified cementitious composite compound coating of make as approved in technical instruction 5/2003 STAGE-II: First layer of slurry of cement @ 0.5 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compounds @ 0.250 Kg/Sqm. This layer will be allowed to air cure for 4 hours. STAGE-III: Second slurry of cement @ 0.500 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compounds @ 0.250 Kg/Sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. STAGE-IV: 200 micron thick polythene film pasted with the help of bituminous adhesive shall be provided over treatment including provided spout pipe complete | 15.00 | Sqm |
| 5 | M&L Cement concrete type E2 ,1:5:10 (using 40mm graded stone aggregate) in foundations, filling and mass concrete as in sunken portion area including demolition of old unserviceable concrete complete all as specified and directed. | 6.00 | Cum |
22 Days Left