Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4245394 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Drain With Rcc Cover Along Service Road Of Ribander Bypass Road (nh-748) At Ch.147/520 To Ch.147/770. |
| Last Date For Submission | 14th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 62703.00 |
| Estimated Cost | 3135133.00 |
| City | Panaji |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :b) All types of Ordinary rock including all types of laterite rock, blasting prohibited. | 637.50 | Cum |
| 2 | Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. complete | 52.50 | Cum |
| 3 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. D) PCC Grade M25. Case -II.With Batching Plant, Transit Mixer and Concrete Pump. | 145.00 | Cum |
| 4 | Supplying and fixing of Precast RCC slabs(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) at site in concrete Grade of M-25 with 20 mm nominal size Granitic or basaltic aggregate, consolidated by means of mechanical platform, vibration etc. with lifting hooks of M.s. 10mm bars and PVC cups including cost of reincforcement, Certificate from manufacturer shall be produced indicating grade of concret and minimum content of steel in the product along with 5 year free replacement warranty in case of breakage complete and as directed by Engineer -in -charge. a) Size 900 x 400 x 150 mm with steel reinforcement not less than 7 kg per unit -30 T capacity. | 625.00 | Each |
| 5 | Centering and shuttering including struttings, propping etc. and removal of formwork for :a) Foundations, footings, bases for columns and mass concrete. | 500.00 | Sqm |
2 Days Left