Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4607981 |
|---|---|
| Organisation Name | Zilla Panchayat |
| Tender Brief | Corrigendum : Beautification Surrounding Golveshwar Temple Along With Approach Road At Mirzalwada Kiranpani Paliem In Ward No. 4 Of V.p. Paliem In Arambol Z.p. Constituency. (xvth Finance Fund) |
| Last Date For Submission | 26th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 24124.00 |
| Estimated Cost | 1206175.00 |
| City | Panaji |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc.(Measurements shall be considered on finished item) . | 73.750 | Cum |
| 2 | Providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the Engineer-in-Charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m. per 100 sq.m. including Providing and laying seal coat sealing the voids in a bituminious surface laid with F.E loader with 1 Cu.m. bucket capacity to the specified levels, grade and cross fall using Type A seal coat with 0.98 kg/sqm of bitumen of grade as per MoRT&H specifications clause 513. | 425.000 | Sqm |
| 3 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | ||
| 4 | All kinds of soil | 53.250 | Cum |
| 5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 22.299 | Cum |
6 Days Left