Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4109576
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Integrated Comprehensive B/r Maintenance Services For Buildings Including Repairs Upkeep And E/m Installations At Madgaon, Supply Depot And Other Units Within The Aor Of Age B/r Madgaon Under Ge Panaji
Last Date For Submission23rd May, 2026
Opening Date30 May, 2026
Cost
Document Cost500.00
EMD90000.00
Estimated Cost4500000.00
Location
CityPanaji
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for 10mm thick plastering in CM 1:6 on fair faces of bricks or concrete surfaces (internal surfaces) finished even and smooth w/o using extra cement incl taking down cement plaster on brick or stone walls surfaces etc including raking out joints hacking for key scrubbing down with water and include for all necessary lowering, etc., removal of rubbish off the premises, removal and depositing serviceable materials where directed and leaving the work clear of any plasteringcomplete all as specified and directed.300.00Sqm
2M&L for Preparation of new surface of wall and applying two coat of oil emulsion distemper over a coat of primer over 3mm thick wall care putty on internal walls surfaces complete all as specified and directed.250.00Sqm
3M&L for Preparation of new surface of wall and applying two coat of oil emulsion distemper over a coat of primer on internal walls surfaces complete all as specified and directed.50.00Sqm
4M&L for 15mm thick external plastering in CM (1:4) with water proofing compound on fair faces of bricks or concrete surfaces finished even and smooth w/o using extra cement taking down cement plaster on brick or stone walls surfaces etc including raking out joints hacking for key scrubbing down with water and include for all necessary lowering, etc., removal of rubbish off the premises, removal and depositing serviceable materials where directed and leaving the work clear of any plasteringcomplete all as specified and directed. complete all as specified and directed. (Water proofing compound will measured and paid separately)250.00Sqm
5Supply only integral water proofing compound complete all as specified and directed.69.60Kg
23rd May, 2026

6 Days Left

WhatsApp