Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4886188 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : M/r To Govt. Resdl Bldgs At Altinho. S.h Repair And Renovation To E- 19 Qtrs At Altinho, Panaji. |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 20121.00 |
| Estimated Cost | 1006057.00 |
| City | Panaji |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 70.60 | sq.m |
| 2 | Removing old loose bottom or side cover of RCC slab beam columns etc. rubbing surface of concrete steel using wire brush and applying 2 coats of Alkaline rust converting primer (Feovert) after a waiting time of 6 hrs between coats and then applying another anti corrosive protective coating system ) for reinforcement bars (IPNet-RB) Conforms to IS-2770 Part-1 (Pull out Test) ASTM-3963-86 (Adhesion Test) and then applying concrete penetrating corrosion inhibitor (EPCO-KP100) and applying bonding new to old concrete (Epibond) Conforms to ASTM-C-882-87 and plastering on the fresh bond coat with Polymer Modified Mortar (Monobond) with 20mm C.M 1:3 and finishing coat of 6mm C.P 1:3 (1 Cement : 3 Sand ) incl. cost of transport etc. as per dir of EIC. All the chemicals will be of Krishna Conchem Products Pvt. Ltd. or Equivalent. | 34.54 | sq.m |
| 3 | Removing dry or oil bound distemper by scrapping sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 673.60 | sq.m |
| 4 | Taking out doors windows and clerestory windows shutters (steel or wood) including stacking within 50 mts. lead;Of area 3 sq.m. and below | 3.00 | Each |
| 5 | Dismantling of existing G.I pipe including disposal of unserviceable material and stacking of serviceable materials .;Upto 20 mm nominal bore | 200.00 | Metre |
13 Days Left