| Tender ID | 4275220 |
|---|---|
| Organisation Name | Haryana Urban Development Authority |
| Tender Brief | Dismantlement And Re-erections Of High Mast In Park Near Hewo Society And Replacement Of Damaged Street Lights In Sector 6 And 2 Mdc U/e Panchkula. (rates Taken In Dnit Exclusive Gst) (including Three Years Free Mtc./ Defect Liability Period Free Of |
| Last Date For Submission | 21st May, 2026 |
| Opening Date | 22 May, 2026 |
| Document Cost | 250.00 |
|---|---|
| EMD | 9340.00 |
| Estimated Cost | 466740.00 |
| City | Panchkula |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [24.13.19]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 19. 16 Sq mm 2 core (UnArm.) | $400.000 | Metre |
| 2 | [24.13.24]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 24. 16 Sq mm 4 core (Arm.) | $350.000 | Metre |
| 3 | [24.4.9.1]STREET LIGHT 9.1. Erection of High mast ( Labour only) on existing CC foundation ( foundation to be paid separately and foundation bolt shall be provided) 12 to 15 metre High mast | $1.000 | Each |
| 4 | [24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 63/50 mm outer dia/inner dia | $250.000 | Metre |
| 5 | Dismantlement of High mast ( Labour only) on existing CC foundation ( foundation to be paid separately and foundation bolt shall be provided) 12 to 15 metre High mast. | $1.000 | Each |