Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kolkata Metropolitan Development Authority
Tender ID4445565
Organisation NameKolkata Metropolitan Development Authority
Tender BriefCleaning, Jungle...floating Materials ...from Aryans School To Girja More In Eastern Side And Tracter India Limited To Aam Bagan More In Western Side Pwd Drain Under Ward No-2,3,4,5,6,7,8 , 10,13,14 Within Panihati Municipal Area... For 6(six) Months
Last Date For Submission12th Jun, 2026
Opening Date15 Jun, 2026
Cost
Document Cost0.00
EMD94057.00
Estimated Cost4702863.00
Location
CityPanihati
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete24900.000Sqm
2Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes,carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete.49800.000Cum
3Clearing and removing solid / semisolid compact mass formed due to water hyacinth in combination with industrial waste, carcasses, municipal garbage, sludge, thick and thorny jungles and long grass etc. and disposal of lifted water hyacinth / semi-solid compact mass by truck or by any other conveyance over kuncha / pucca road including making access for plying the truck or any other conveyance beyond 240 m from the lifting point including cost of loading , unloading , transporting, arrangement of land, if required by the agency all complete including all leads and lifts. (This item can only be used after obtaining permission from the Superintending Engineer) Mode of measurement : Payment will be made on the basis on the stack measurement after deducting voids29880.000Cum
4Add L Cess @1% on Total from Sl No 1 to 34656300.000Nos
12th Jun, 2026

12 Days Left

WhatsApp