Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4261791 |
|---|---|
| Organisation Name | Municipal Affairs Department |
| Tender Brief | Corrigendum : Construction And Laying Of New Drainage Line With Dwc Pipe Beside Purbachal Ward Office, Back Portion Of The Small Park Within Ward No.- 37 Under Bidhannagar Municipal Corporation. |
| Last Date For Submission | 4th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 64862.00 |
| Estimated Cost | 3243121.00 |
| City | Parganas |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 36.00 | m3 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 36.00 | m3 |
| 3 | Labour for taking out old soling edging including removing debris (b) Double flat soling | 240.00 | %m2 |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm | 360.00 | %m3 |
| 5 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (a) Depth upto 1.5 m. | 600.00 | m2 |
4 Days Left