Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation And Waterways Department
Tender ID4306336
Organisation NameIrrigation And Waterways Department
Tender BriefCorrigendum : Emergent Protection Work To The Eroding Left Bank Of River Nanagong From Ch.39.55 Km. To 39.685 Km. Total Length 135.00 Mtr. At Mouza Kankpool Under Ashokenagar Kalyangarh Municipality Block Habraii Dist North 24 Parganas
Last Date For Submission11th Jun, 2026
Opening Date11 Jun, 2026
Cost
Document Cost0.00
EMD29126.00
Estimated Cost1456301.00
Location
CityParganas
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. iii)12.50 cm av.Diametre.1305.00Metre
2Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (ii) 12.5 cm av. Diameter.1044.00Metre
3Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus.370.00Metre
4Supplying Nylon cage netting 1 metre x 1 metre x 1metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250Kg./sq.cm. including carriage, delivery and stacking at site inclusive of all taxes complete.780.00each
5Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer in Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m 3 . Size of Nylon crate is 1metre X 1metre X 1metr780.00each
11th Jun, 2026

7 Days Left

WhatsApp