Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Health Engineering Department
Tender ID5027053
Organisation NamePublic Health Engineering Department
Tender BriefOperation And Maintenance Of Iron Elimination Plant At Maslandapur (zone - Ii) W/s Scheme Under Habra Sub-division, P.h.e. Dte. For One Year
Last Date For Submission3rd Aug, 2026
Opening Date06 Aug, 2026
Cost
Document Cost7000.00
EMD12072.00
Estimated Cost603598.00
Location
CityParganas
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Opening & closing of all the different dia sluive valves on different places along the alignment of the rising main and distribution main within Head Works Site daily as and when required for regulating the supply of water and distributing water all over the command area smoothly including changing and restoration of gland packing of sluice valve, air valve if required including opening the cap/plug of wash out point or opening the sluice valves including de-jointing flange joints including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and direction of EIC. 2 nos. Operator per day (365 x2 ) = 730 days Daily wages= Rs. 684 (Rate approved by SE/EC) NB: a. Contractor have to issue Identity Card to the I.E.P. operator. b. Contractor have to produce proper payment voucher in every month of daily worker to the EIC through concerned Assistant Engineer. c. Daily rate to each labour will have to be paid by the agency not less than Rs. 487/- (Rupees Four hundred eighty seven) only per day and bonus amounting @ 8.33% per day of the daily worker. d. The contractor have to pay the excess amount to the I.E.P. Operator during Operation & Maintenance Period even after execution of contract agreement, due to enhancement of rate of wages as per Govt. order. The contractor will submit the bill of excess payment separately for reimbursement. e. Payment of each month have to be paid within 07th of following month. f. Non compliance of payment terms by the Agency will attract action towards payment of I.E.P Operators in case of exigencies by EIC directly as a principal employer as per availability of fund and no payment will be made against this item to the Agency. This may lead to termination of tender forthwith and the agency may be barred from participating in tendering process for 3 (three) years.730Day
2Supervision charges for electrical installation by licensed Electrician as per IE Rules, 1956 read with latest amendments overhead expenditures [Existing SE/EC rate Rs. 63600/-x0.9434 x1= 60000.24 Say = 60000.00, (For 12 months)]1L.S.
3During the period of Operation & Maintenance, all necessary manpower technical skilled or unskilled, all accessories (civil, mechanical, electrical and instrumental) oil, lubricants and other consumable materials for Blower & Compressor etc which are required for normal operation shall be provided by the contractor at his own cost, PHE Department will bear only the cost of electricity. Any petty repairing, breakdown or defect shall be promptly rectified or replaced by contractor and cost of oil, lubricant or consumable materials for repairs etc that during the idle period shall be borne by the contractor. If the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D.Money. Responsible technical representative of the contractor must visit the site at regular intervals and also on call during the period and inform to the E.I.C. [Existing SE/EC rate Rs. 6000/- x 0.9434 x 1 = 5660,04 Say = 5660.00, (For 12 months)]1L.S.
4During the period of Operation & Maintenance, all necessary manpower technical skilled or unskilled, all accessories related to all kind of valves of pipelines and vessels which are required for normal operation shall be provided by the contractor at his own cost, maintenance of pipelines related to IEP within head works site. Any petty repairing or defect shall be promptly rectified or replaced by contractor during the idle period shall be borne by the contractor. If the contractor fails to rectify or replace the defects in reasonable time, the same will be done by employing other agency and the relevant expenditure will be realized from the payments and S.D.Money. Responsible technical representative of the contractor must visit the site at regular intervals and also on call during the period and inform to the E.I.C. [Existing SE/EC rate Rs. 8400/- x 0.9434 x 1 = 7924.56 Say = 7325.00, (For 12 months)]1L.S.
5Chemical & Bacteriological testing of Raw Water & Treated Water sample including cost of collection after each unit carrying to designated PHE/other laboratories and submission of report to the E.I.C. at regular interval (1 time in every three months) by the contractor at his own cost during the O&M Period. [Existing SE/EC rate Rs. 5000/- x 0.9434 x 1 =4717.00 (For 12 months)]1L.S.
3rd Aug, 2026