| Tender ID | 4249472 |
|---|---|
| Organisation Name | Municipal Affairs Department |
| Tender Brief | Shoring Work With Sheet Pile At Ugr Site At Bst Plant Within Ward No 17 Of Bidhannagar Municipal Corporation. |
| Last Date For Submission | 28th May, 2026 |
| Opening Date | 30 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 199431.00 |
| Estimated Cost | 9971540.00 |
| City | Parganas |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Hire and labour charges for shoring with Sheet pile (8 mm thick) & ISMB-250 runner, struts, anchor, tie etc. complete. Beam section conforming to IS-226 IS:808 & SP(6)-1964 including cutting to requisite length, fabrication with necessary welding conforming to IS: 816-1956 & IS: 1995 using electrodes of approved make and brand conforming to IS: 814-1957 including driving and complete removing them as per direction of the Engineer-inCharge. For overall depth of excavation from G.L., a) 4.0 M to below 5.0 M. | 652.00 | sqm |
| 2 | Hire and labour charges for shoring with Sheet pile (8 mm thick) & ISMB-250 runner, struts, anchor, tie etc. complete. Beam section conforming to IS-226 IS:808 & SP(6)-1964 including cutting to requisite length, fabrication with necessary welding conforming to IS: 816-1956 & IS: 1995 using electrodes of approved make and brand conforming to IS: 814-1957 including driving and complete removing them as per direction of the Engineer-inCharge. For overall depth of excavation from G.L., b) 5.0 M to below 6.0 M. | 130.40 | sqm |
| 3 | Hire and labour charges for shoring with Sheet pile (8 mm thick) & ISMB-250 runner, struts, anchor, tie etc. complete. Beam section conforming to IS-226 IS:808 & SP(6)-1964 including cutting to requisite length, fabrication with necessary welding conforming to IS: 816-1956 & IS: 1995 using electrodes of approved make and brand conforming to IS: 814-1957 including driving and complete removing them as per direction of the Engineer-inCharge. For overall depth of excavation from G.L., c) 6.0 M to below 7.0 M. | 65.20 | sqm |