| Tender ID | 5028325 |
|---|---|
| Organisation Name | Zilla Parishad |
| Tender Brief | Construction Of One Storied Icds Building Of Murarichak Icds, 19344391412, Mouza-murarichak, Jl No-401, Khatian No-33, Plot No-192, Gp-bishnupur Under Sabang Development Block In The District Of Paschim Medinipur |
| Last Date For Submission | 7th Aug, 2026 |
| Opening Date | 10 Aug, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 26683.00 |
| Estimated Cost | 1334146.00 |
| City | Paschim Medinipur |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 41.9175 | Cum |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 8.3835 | Cum |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 33.534 | Cum |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (c) (i) With carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth. | 48.000 | Cum |
| 5 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by through Saturation with water,ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity) | 39.3705 | Cum |