Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Zilla Parishad
Tender ID5028294
Organisation NameZilla Parishad
Tender BriefDevelopment Of Collage Ground At Sabang Sajani Kanta Mahavidyalay Mouza-lutunia,jl No-123,plot No-007, G.p.-debhog, Under Sabang Development Block In The Dist Of Paschim Medinipur.
Last Date For Submission7th Aug, 2026
Opening Date10 Aug, 2026
Cost
Document Cost15000.00
EMD199978.00
Estimated Cost9998903.00
Location
CityPaschim Medinipur
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.11880.000Sqm
2Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.168.750Cum
3Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.33.750Cum
4Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by through Saturation with water,ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity)101.250Cum
5Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)135.000Cum
7th Aug, 2026

17 Days Left

WhatsApp