Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026991 |
|---|---|
| Organisation Name | West Bengal Agro Industries Corporation Limited |
| Tender Brief | Installation Of High Must Tower Light |
| Last Date For Submission | 4th Aug, 2026 |
| Opening Date | 07 Aug, 2026 |
| Document Cost | 885.00 |
|---|---|
| EMD | 6990.00 |
| Estimated Cost | 349225.00 |
| City | Paschim Medinipur |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying& Delivery At Site Of 11 Mt. GI Oclagonal Pole Including Arangement Of Monkey Ladder, Arms Fixing With Octagonal Cross Section And Contentiously Tapered With Single Longitudinal Welding.Total Length of The Pole Will Be 11 Mtr. Thickness Of Sheet Should Not Be Less Than 3 Mm, Diarneter Of The Polo At Bottom & Top Will Be 340 Mm And 150 Mm Respectively Base Plate 520 X 25mm. Pole Shafts Shall Be Provided With Fixed Flange Plate Of Minimum 16 Mm Thickness With A Provision Of Minimum 4 Nos Fixing Foundation Hot Dipped Galvanised Bolls. AlI Other Hardware I.E Nuts& Bolts, Washers, Spring Washers, Flats, Split Pins Elc. Should Be Hot Galavanised. (BAJAJ/ TRANSRAL/ Utkarsh/ CG/ Approved Make.) | 1.00 | Item |
| 2 | ERECTION OF 11 MTR HIGHMAST WITH MODERN ENGINEERING PRACTICES WITH TESTING AND COMMISIONING ALL | 1.00 | Item |
| 3 | Making Of RCC Foundatlon With M20 Grade Of Concrete (6:3:1)With Graded Stone Chips (20mm Normal Size) Excluding Shuttering And Reinforcement If Any, In Ground Floor As Per Relevant IS Codes For Soil Bearing Capacity Of 8 To 10 Ton/Sqm At A Depth Of 1.00m To 1.50m, Collaring Shall Be 200mm Above The Ground Level. | 1.00 | Each |
| 4 | Supplying Fitting And Fixing 1.1 KV Grade 10 sq Mm 2 Core PVC Insulaled Armour Amounted Alluminium Conductor Cable For Hanging Make - Havells /Pollycab / KEI IGlostar OR Equievalent | 65.00 | Mtr |
| 5 | Laying Of One No. Cable Upto 35 Sqmm In Underground Trench 460 Mm Wide X 760 Mm Average Depth, With Brick Protection On The Top Of The Cable With 8 (Eight) Nos. Bricks Per Metre, Including Filling The Space Shifted Between The Brick & Cable And Also The Trench shifted Soil, Leveling Up And Restoring Surface Duly Rammed | 54.00 | Mtr |
14 Days Left