| Tender ID | 4888719 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Jal Jeevan Mission (jjm)-rwss To Cherukole-naranganam Design And Construction Of 10 Mld Water Treatment Plant With 8.5ll Sump Cum Pumphouse And 5ll Ohsr At Vayalathala Wtp Site-general Civil Work |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 19518.00 |
|---|---|
| EMD | 500000.00 |
| Estimated Cost | 131430394.00 |
| City | Pathanamthitta |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Appendix - 1 Construction of aerator | ||
| 2 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 14.051 | cum |
| 3 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 14.051 | cum |
| 4 | 2.9.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (requiring blasting) | 1.561 | cum |
| 5 | 2.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited) | 1.561 | cum |