Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala Water Authority
Tender ID4888719
Organisation NameKerala Water Authority
Tender BriefCorrigendum : Jal Jeevan Mission (jjm)-rwss To Cherukole-naranganam Design And Construction Of 10 Mld Water Treatment Plant With 8.5ll Sump Cum Pumphouse And 5ll Ohsr At Vayalathala Wtp Site-general Civil Work
Last Date For Submission27th Jul, 2026
Opening Date28 Jul, 2026
Cost
Document Cost19518.00
EMD500000.00
Estimated Cost131430394.00
Location
CityPathanamthitta
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Appendix - 1 Construction of aerator
22.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil14.051cum
32.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock14.051cum
42.9.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (requiring blasting)1.561cum
52.9.3:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (blasting prohibited)1.561cum