Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Local Self Government Department
Tender ID4599772
Organisation NameLocal Self Government Department
Tender BriefCorrigendum : Naranganam Gp Project No.109/26,plakkal Kalloor-road Maintenance In Ward 8-
Last Date For Submission20th Jun, 2026
Opening Date20 Jun, 2026
Cost
Document Cost745.00
EMD8404.00
Estimated Cost336179.00
Location
CityPathanamthitta
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Road Renovation Work
23.19.1.B:Surface Drains in Soil<br> Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.<br> (B) Mechanical Means177.000metre
375.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.66.820sqm
475.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.19.620sqm
54.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead7.875cum
20th Jun, 2026

Closed

WhatsApp