Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4856391 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | General Budget Work 2025 2026 Improvements By Providing Bmandbc To Enadimangalam Puthenchanda Theppupara Road Ch 0.00 To 5.000 Poothankara Puthenchandatheppupara Puthumala Road General Civil Work General Civil Work |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 9759.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 28133342.00 |
| City | Pathanamthitta |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | ROAD WORK | ||
| 2 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 6.400 | cum |
| 3 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 24.000 | cum |
| 4 | OD24456/2025-2026:Dismantling of flexible pavement and sectioning the dismantled material and re-rolling | 5000.000 | sqm |
| 5 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 1098.000 | cum |
10 Days Left