Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4604275 |
|---|---|
| Organisation Name | Punjab Mandi Board |
| Tender Brief | Corrigendum : Construction Of 3 Span Rcc Bridge 7 Mtrs Each On Link Road Sujanpur To Sarna Along Ubdc Malikpur Head Works Under Pmgsy- Iii Batch-2 Package No. Pb 21-004 Block Sujanpur Distt. Pathankot Pb-21-004 |
| Last Date For Submission | 26th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 20000.00 |
|---|---|
| EMD | 336000.00 |
| Estimated Cost | 0.00 |
| City | Pathankot |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottam and back filling with approved material.) Ordinary soil upto 3.00 metre depth. | 1331.34 | CUM (Cubic Metre) |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottam and back filling with approved material.) Ordinary soil 3.00 metre to 6.0 meter depth. | 39.92 | CUM (Cubic Metre) |
| 3 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) for base course under Abutment and Pier complete as per drawing & technical specifications. | 227.67 | CUM (Cubic Metre) |
| 4 | PCC Grade ( M-20 ) Plain/Reinforced Cement Concrete in Sub Structure Complete as per drawing and Technical Specification.using batching plant transit mixer & Concrete pump | 1070.07 | CUM (Cubic Metre) |
| 5 | Plain/Reinforced cement concrete (R.C.C.M-30) in open foundation complete as per drawing and technical specifications for Abutment/Pier/Wing wall Footing including centring shuttering but excluding steel reinforcement complete as per drawing and technical specifications. using batching plant transit mixer & Concrete pump | 207.46 | CUM (Cubic Metre) |
Ending Today