Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4516455 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Cleaning Of Sewage Line, Manhole, Septic Tanks And Soakage Well In Md Accn Under Age B/r-i Of Ge (south) Mamun |
| Last Date For Submission | 2nd Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2500000.00 |
| City | Pathankot |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Rectifying complaints of bathroom / kitchen / WHB / urinals / WCs of any pattern by cleaning the blockage upto first manhole and making it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits (Earth work if any and making good to disturbed surface shall be deemed to be included in unit rate) complete all as specified and directed. Notes for item no. 1.00 to 3.00:- (a)Unit rate quoted shall include taking out sludge away from residential area and burying in borrow pits. (b) The payment shall be done by complaint wise. (c) The period of rectifying each complaints shall be maximum 48 hrs and in case of failure to rectify the complaint in the stipulated period the necessary recovery at the rate of Rs 500/-per day per complaint shall be deducted from next payment due to contractor without any notice. (d) The contractor shall provide cleaning personal/ workmen alongwith necessary tools, bucket & safety tools to rectify the complaints and the cost thereof shall be deemed included in unit rate. | 2500.00 | Each Complaint |
| 2 | Rectifying complaints by cleaning the sewage lines of 150mm bore incl cleaning of manhole etc by using cleaning rod or other mechinical means and make it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits including taking off manhole cover carefully and refixing the same after completion of job complete all as specified and directed. (Earth work, if any, and making good to disturbed surface shall be deemed to be included in unit rate) | 2200.00 | RM |
| 3 | Rectifying complaints by cleaning of sewage lines of 200 mm bore and depth incl cleaning of manhole etc by using cleaning rod or other mechinical mean and make it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits including taking off manhole cover carefully and refixing the same after completion of job complete all as specified and directed. (Earth work, if any, and making good to disturbed surface shall be deemed to be included in unit rate) | 800.00 | RM |
| 4 | Rectifying complaints by cleaning of sewage lines of 300 mm bore and depth incl cleaning of manhole etc by using cleaning rod or other mechinical mean and make it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits including taking off manhole cover carefully and refixing the same after completion of job complete all as specified and directed. (Earth work, if any, and making good to disturbed surface shall be deemed to be included in unit rate) | 350.00 | RM |
| 5 | Opening manhole cover of Septic tank of any description, size and depth and de-sluding the septic tank by mechanical pumping (using truck moulded pump) by plugging inlet as required, removing sludge from MoD premises at his own arrangement and burying it in pit as per direction of Civil Administration, making septic tank fully functional to the entire satisfaction of Engr-in-charge including carrying the effluent by deplugging the inlet and re-fixing the manholes cover to its original position complete all as specified and directed. Note:- Unit rate quoted by tenderer shall include taking out sludge from septic tanks in liquid/ semi liquid/ solid state out side defence area and burying in borrow pits as per direction of Civil Administration. Cost of earth work for borrow pits shall also be deemed included in unit rate of the item. | 250.00 | Cum |
6 Days Left