Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4982283 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/maint Of Hv/lv Electrcal System, Day To Day Complaints And Improvement Of Mes Installations And Connected Works At Sec A, Dablan And Barsat Under Ge (north) Patiala |
| Last Date For Submission | 13th Aug, 2026 |
| Opening Date | 15 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Patiala |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, fixing, including commissioning of 16M high mast 360/150--3/3 shaft in two section suitable for 47 m/sec wind speed along with head frame, luminaires carriage suitable for 6-9 luminaires in symmetrical arrangement and other accessories manufactured in factory. Supply of raising lowering system comprising double drum winch, 4mm diameter SS wire rope, trailing cable, connector, integral power tool motor, manual handle, junction box, lightning finial. (a) Supply and fix foundation bolts along with nuts, washers, anchor plate and common template. (b) Supply and fix LED type single dome aviation obstruction light. (c) Supply and fix outdoor stand mounted feeder pillar with 32A TPN MCB incomer, single dial time switch, 25A TP contactor for the automatic switching of luminaries, power tool control with 2 no 9A contactors and raise lower push button, Incoming 35 sq. mm and out going 16 & 2.5 sq. mm terminals.Complete all as specified and as directed. Make:- Bajaj/Utkarsh/Jindal power corporation . | 1.0 | Each Job |
| 2 | Supply, installing,commissioning and testing 100 Watt Solar AIO LED Street Light with luminair efficacy of 150 lm/W with minimum lumen output of 15000 lumens.The solar panel should be of 150W with Monocrystalline cells with 78Ah LiFePO4 battery pack. Manufacturers Logo/name must be engraved/Embossed on luminaire Housing. Manufacturer must have In-House NABL accredited laboratory with scope of testing & callibration of Electrical, Mechanical & Photometry Parameters as per IS10322:2012, IS16104, IS16106, IEC60598-1, IEC62262:2002, IEC60068-2-75, IEC60529, IES LM79, IS16102 (Part 2, Clause 8).Solar light fitting should be reliable to fit on 410 SP-31 9.00 meter long steel tubular pole complete all specified and as directed by Engineer-in-charge. Notes:- The bidder shall submitt the following documents alongwith sample for approval of sample by GE (1) LM79 Report from NABL Accredited Lab of Light supplied. (2) Technical Data Sheet of Solar Street Light. (3) Type Test Report of Solar Street Light. (4) BIS Certificate of Battery. (5) LM80 Report of LED Chip used in fixture. (6) Data Sheet of LED Chip used in fixture. | 5.0 | Each |
| 3 | Material and labour for earthing complete with galvanised steel earth Coil of 50 mm dia have 115 turns, burried directly in to ground ( earth pit size should be 1500mm X 600mm + size of coil) not less than 1500 mm + Coil Size deep below GL with top edge of earth coil not less than 1500mm below ground level surrounded with adequate quantity of charcoal dust mixed with salt to a packed thickness of 600mm all around the coil, connected to GI lead wire of 4 mm dia (1.75 m Long) by means of nuts, bolts and washers, checknuts of GI and distance of the earthing bore from the pole should be 1200mm Minimum complete all specified and as directed by Engineer-in-charge. | 5.0 | Each set |
| 4 | Material and labour for reinforced cement concrete foundation for the 16 m high mast light considering the safe soil bearing capacity at site as 10 T/sqmtr at 2 metre depth including excavation and earth work including the erection of the high mast with the help of suitable tools and plants, wiring of luminaires with all wiring materials like PVC insulated PVC sheathed flexible cable of suitable copper conductor cores of 1.5 sq. mm, lugs, MCB and all labour and Installation of the mast feeder pillar by grouting the stand in concrete complete all as specified and as directed by Engineer-in-charge. Notes:- (i) Foundation for hight mast light shall be as recommended by OEM and Designed from IIT/NIT/ Govt Engineering college' as directected by GE and submitted to GE for approval. (ii) Foundation design shall be approved by GE in writting.(iii) The cost of design shall be included in the quoted rates. | 1.0 | Each Job |
| 5 | Supply and fixing LED flood light 120 watt 230 V AC outdoor type with thermal management in multiple optics and equipped with IP66 protection, with impact and corrosion resistant with driver and lamp complete all specified and as directed by Engineer-in-charge. | 24.0 | Each |
6 Days Left