Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4404018
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repair To Certain Roads Under Age Br-ii Of Ge (north) Patiala
Last Date For Submission22nd Jun, 2026
Opening Date24 Jun, 2026
Cost
Document Cost500.00
EMD100000.00
Estimated Cost5000000.00
Location
CityPatiala
StatePunjab

Register to see full details

BOQ Items
#ItemQtyUnits
1Repairs to pot holes any depth, not exceeding 1 Sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 Sqm of paving bitumen, VG-10 putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m of paving bitumen, blinded with 0.09 cum of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings), depth of pot holes exceeding 30mm all as specified and as directed by Engineer-in-charge.10.00X Sqm
2Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm, exc 50mm and n exc 100 mm deep complete all as specified and as directed by Engineer-in-charge.20.00X Sqm
3Material and labour for 7.5cm thick Granite trap or Basalt (compacted thickness) WBM,with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated to gradient materials and camber required complete all as specified and as directed by Engineer-in-charge..20.00X Sqm
4Material and labour for preparing the unsurfaced WBM surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally cleaning the surfaces with mechanical compressor to remove all loose dirt etc and applying evenly priming/ tack coat with bituminous primer (paving VG - 10 grade bitumen) @ 5 Kg per 10 Sqm complete all as specified and as directed by Engineer-in-charge.20.00X Sqm
5Material and Labour for preparing the existing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally cleaning the surfaces with mechanical compressor to remove all loose dirt etc and applying evenly priming/ tack coat with bituminous primer (paving VG - 10 grade bitumen) @ 5 Kg per 10 Sqm complete all as specified and as directed by Engineer-in-charge.1200.00X Sqm
22nd Jun, 2026

6 Days Left