Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4779082 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Smart Periodicals To Certain Bldg, Otm And Md Accn At Dappar Under Age (i) Dappar |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 29 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 60000.00 |
| Estimated Cost | 3000000.00 |
| City | Patiala |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material and labour for complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and as directedv by Engineer-in-charge. | 10000 | Sqm |
| 2 | Material and labour for preparation of new plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Note : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 800 | Sqm |
| 3 | Material and labour for preparation of old plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 10000 | Sqm |
| 4 | Material and labour for preparation of old plastered surfaces and applying one coats of cement base paint complete all as specified and as directed by Engineer-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 19000 | Sqm |
| 5 | Material and labour preparation of plastered surface and applying one coat of wall care putty to achieve the surface even and smooth for painting complete all as specified and as directed by Engineer-in-charge. | 4000 | Sqm |
6 Days Left