Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853099 |
|---|---|
| Organisation Name | Municipal Administration And Water Supply Department |
| Tender Brief | Desilting Of Well, Providing Repair Repair Work In Well Cover And Electrical Works In Open Well At Chekkadi Street, Samipirandha Idam, Vellanthagiamman Koil Near In Ward No.18 |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6600.00 |
| Estimated Cost | 660000.00 |
| City | Perambalur |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete | 37.00 | m3 |
| 2 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing,etc., complete complying with standard speci cation and as directed by the departmental of cers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 5.00 | m3 |
| 3 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all oors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard speci cation and as directed by the departmental of cers. | 31.00 | m2 |
| 4 | Providing Dewatering During Well Earth work 10% of cost of Exevation shall be adopted for dewatering for estimate purpose Actualor presentwhich ever is less to be allowed for dewatering charges etc complete.Hire charges forndiesel pumpset 7.5 HP with fuel and crew charges including transportation etc complete. | 30.00 | m3 |
| 5 | Providing MS Angle and plate for safety arrangement to the open well including cost of all labour ,materials ,welding ,cutting , lath work , painting redoxide and cutting and welding of weldmesh etc complete. | 1600.00 | kg |
8 Days Left