Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4819591
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Of 4-lane Divided Cw From Nh To Electronic City (electronic City Approach Road) Under Pernem Constituency Of Pernem Taluka
Last Date For Submission13th Aug, 2026
Opening Date14 Aug, 2026
Cost
Document Cost40000.00
EMD26087531.00
Estimated Cost2508753140.00
Location
CityPernem
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and upto trees grith 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORTH SPecification 201; By Manual Means;In area of thorny jungle..4.24Hectare
2Excavation for roadway in ordinary rock by deploying a dozer 80 HP including cutting and pushing the cut arth to site of embankement upto a distance of 100 metres (average lead 50 metres) trimming bottom and side slopes in accordance with the requirements of lines grades and cross sections as per MORTH Specification 301..11167.51m3
3Excavation for roadway in hardrock (blasting prohibited) with rock breakers including breaking rock loading in tippers and disposal within all lifts and lead upto 1000 metres trimming bottom and side slopes in accordance with requirements of lines grades and cross-sections as per MORTH Specification 301 (The quality and availability of rock shall be checked before affording credit.Credit for excavated rock found suitable for use @ 50 per cent of excavated quantity )>Mechanised...54719.47m3
4Construction of embankement with approved material obtained from borrowpits with all lifts and leads transporting to site spreading grading to required slope and compacting with vibratory roller to meet requirement of Table 300-2 as per MORTH specification 305.85485.09m3
5Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads transporting to site spreading grading to required slope and compacted to meet requirement of table No. 300-2)27006.24m3
13th Aug, 2026

13 Days Left

WhatsApp