Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala State Electricity Board
Tender ID4766716
Organisation NameKerala State Electricity Board
Tender BriefCorrigendum : Constructing 11kv Ug Cable From Chully Ab To Mooleppara Jn Under Electrical Section Thuravoor
Last Date For Submission27th Jul, 2026
Opening Date31 Jul, 2026
Cost
Document Cost5900.00
EMD50000.00
Estimated Cost5176374.00
Location
CityPerumbavoor
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.3Trip
2Laying 11kV 3x300 sqmm. XLPE UG cable by HDD method along / across roads, supplying and pulling 110 mm HDPE/GI pipe duct, drawing 11kV 3x300 sqmm. XLPE UG cable through the duct including surveying the site for collecting information about under ground utility installations and other obstructions using suitable modern sensing equipments , restoring the damages occured if any, pit making , pilot drilling, pre remaining closing of pits with normal soil/filled sand/crusher sand and consolidation to the satisfaction of the road owner and traffic police as they insist , taking the cable to the open trenches, RMUs, transformer yard etc, mounting the cable including clamping after providing loop at 1.2m depth , putting HDPE (PE63.4kg./Sq.cm) at rising point(0.5m below ground level and 1.5 m above ground level) making RCC jointing chambers for straight joints if any, testing , commissioning , placing route markers at 100m interval , writing identification name , date of laying , date of commissioning etc.legibly on the cable rising using polyurethane paint etc..as per the direction of dept. officers, providing with as built laminated cable route drawing , marking the HDD pits, distance of pits from the boundary of the road , length of cable bit etc.including the cost of all materials, labour and hire charges , loading the cable from KSEB L stock yard and transporting the cable using contractor supplied trailer and unloading the same at work site .complete except the cost of 3 core 300 sq. mm XLPE UG Cable.2300m
3Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.1No
4Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.6No
5Drilling hole of various sizes on existing Channel/Cross Arm.9No
27th Jul, 2026

11 Days Left

WhatsApp