Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4218902 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Corrigendum : General-pvip-painting The Shutters And Hoisting Platform And Overhauling The Hoisting Mechanism Of Chenkara Regulator-general Mechanical Work |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 28 May, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 3693.00 |
| Estimated Cost | 147731.00 |
| City | Perumbavoor |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling the existing shutter and hoist with rollers, painting the shutter and hoist and erection of shutter and hoist after patch working and painting | ||
| 2 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 187.103 | sqm |
| 3 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 102.915 | sqm |
| 4 | OD25510/2025-2026:Refitting the already dismantled hoisting bridge and hoisting unit back in the original position after ertecting the shutter. including conecting position, aligning etc. including cost of all machinery, labour all incidental and conveyance charges etc complete qs per direction of departmental officer at site | 285.000 | kg |
| 5 | OD25511/2025-2026:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embedded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80 % ) | 285.000 | kg |
4 Days Left