Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4214652
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction Work Of Community Center/marriage Hall In Village Chandia Hazara Block Puranpur Under Puranpur Assembly
Last Date For Submission25th May, 2026
Opening Date25 May, 2026
Cost
Document Cost1062.00
EMD210000.00
Estimated Cost2100000.00
Location
CityPilibhit
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & Iead upto 30m Including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches.SOR (251).76.92Cum
2Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the engineer incharge . (Carted Earth 3.00 Km.) SOR 253.61.18Cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per DSR 2023 SI no. 4.1.816.77Cum
4Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per DSR 2023. SI No- 6.1.232.26cum
5Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). as per DSR 2023 SI No-5.336.00Cum
25th May, 2026

12 Days Left

WhatsApp