Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4212039 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Construction Work Of Funeral Point/funeral Home In Village Pipariya Mandan, Block Barkheda Under Barkheda Assembly |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 25 May, 2026 |
| Document Cost | 1062.00 |
|---|---|
| EMD | 210000.00 |
| Estimated Cost | 2100000.00 |
| City | Pilibhit |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & Iead upto 30m Including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches.SOR (251). | 22.54 | Cum |
| 2 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the engineer incharge . (Carted Earth 3.00 Km.) SOR 2 | 23.66 | Cum |
| 3 | Concrete with 4cm(1 "). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work. (S.I.No. 275) | 7.91 | Cum |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) DSR 6.1.2 | 8.95 | Cum |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 5.1.2 | 5.69 | Cum |
12 Days Left