Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited
Tender ID4260232
Organisation NameBridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited
Tender BriefCorrigendum : Construction Of Food Godown And Residential Block At Badiyakot,kapkot,distt Bageshwar.
Last Date For Submission3rd Jun, 2026
Opening Date03 Jun, 2026
Cost
Document Cost5900.00
EMD332000.00
Estimated Cost16609000.00
Location
CityPithoragarh
StateUttarakhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. :All kinds of soil.185.63Cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed. :Ordinary rock37.13Cum
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.286.22Cum
4Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.17.84Cum
5Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
3rd Jun, 2026

6 Days Left

WhatsApp