Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4122113
Organisation NamePublic Works Department
Tender BriefCorrigendum : Providing Protective Measures To Road Side At Jagor Mann At Apewal In V.p.k In Priol Constituency Of Ponda Taluka.
Last Date For Submission18th May, 2026
Opening Date20 May, 2026
Cost
Document Cost5000.00
EMD39020.00
Estimated Cost1950850.00
Location
CityPonda
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation of foundation of structures of culverts, abutments piers, retaining walls etc. as per drawing and technical specification, in all types of strata comprising any of the material such as soil, silt sand, clay, gravel, murrum of all varieties shingles, pebbles all types of conglomerates, laterite rock etc soft rock, ordinary rock or disintegrated rock fissured shattered/ decomposed rock or weathered rock all such material as described under appendix to those specification either in full or in parts as the case may be adopting mechanical means (hydraulic excavator) or any approved method or methods as the case may be convenient or permitted inclusive of chiseling and wedging etc in all conditions such as dry, moist, saturated, submerged, foul condition etc including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides, ramming of bottoms, getting out the excavated soil/rock to be leveled and neatly dressed,
2pumping and bailing out of water, back filling the excavated earth to the extent required and utilizing the remaining earth locally for road work, barricading, danger lightening, guarding and disposal of excavated earth as directed by the engineer in charge all complete including all leads and lifts and up to depth of excavation as per MoRT & H Specification 304.160.00Cu m
3Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. in pipeline trenches and other foundation complete.23.00Cu m
4Centering & shuttering including Strutting, Propping & removal of formwork for :
5i) Foundations, Footings, Bases for columns and mass concrete214.50Sq.m.
18th May, 2026

13 Days Left

WhatsApp