Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4894732
Organisation NamePublic Works Department
Tender BriefCorrigendum : Consultancy Services For Preparation Of Conceptual Drawings, Design And Detailed Project Report For Renovation And Modernization Of Indira Gandhi Sports Complex, Puducherry.
Last Date For Submission12th Aug, 2026
Opening Date12 Aug, 2026
Cost
Document Cost525.00
EMD200000.00
Estimated Cost0.00
Location
CityPondicherry
StatePondicherry

Register to see full details

BOQ Items
#ItemQtyUnits
1Survey and Investigations of the existing galleries, roofing, indoor halls, track and field; documentation of existing utilities (water, drainage, electrical, Air conditioning in Indoor, fire-fighting). Preparation and submission of Inception Report covering survey findings, analysis of survey and condition assessment; identification of deficiencies in existing1.000Job
2Preparation of minimum 3 conceptual drawing & design options for modernization of galleries, seating, roofing, football ground and other sports facilities such as cricket practise net, Kabadi court, handball court, etc., office buildings, Gym, Medic centre, Physiotherapy centre and indoor facilities; circulation and zoning improvements; parking and landscaping options; Multifunctional halls & Provisions for Electrical/Genset rendered views and 3D walkthroughs; incorporation of energy efficiency and universal accessibility; submission of Conceptual Drawing & Design Report1.000Job
3Preparation and submission of Draft Detailed Design Report including detailed architectural drawings for renovation of spectator galleries, amenities (toilets, VIP boxes, press/media zones, player changing rooms, medical/doping control rooms), up gradation of football ground improvement, Office buildings, indoor sports facilities, supporting infrastructure (roads, drainage, electrical arrangements, landscaping, fire safety, electrical arrangements, HVAC arrangements, accessibility); preliminary BOQs and Detailed Project Reports as per PWD Schedule Of Rates 2024-25; submission of Draft Report1.000Job
4Preparation and submission of Detailed Project Report including Final Detailed Design Report Good-for-Construction drawings, final BOQs and cost estimates, lifecycle cost analysis (synthetic track, turf, roofing), O&M guidelines; BIM model (LOD 300) for coordination; 1.000Job
12th Aug, 2026

13 Days Left

WhatsApp