Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4894735 |
|---|---|
| Organisation Name | Department Of Local Administration |
| Tender Brief | Corrigendum : Integrated Infrastructure Development And Environmental Safeguarding Of Processing Plant Zone At Rrp, Kurumbapet. |
| Last Date For Submission | 6th Aug, 2026 |
| Opening Date | 06 Aug, 2026 |
| Document Cost | 1575.00 |
|---|---|
| EMD | 2530900.00 |
| Estimated Cost | 153090004.00 |
| City | Pondicherry |
|---|---|
| State | Pondicherry |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Code No. 2.8.1 Earth work in excavation by mechanical means means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m -All kinds of soil. | 4095 | cum |
| 2 | Code no:3.3 Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres) including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 1720 | cum |
| 3 | Code No. 4.1.2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size) | 765 | cum |
| 4 | Code No. 4.1.5 Providing and laying in position cement concrete excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm nominal size) | 480 | cum |
| 5 | Code No. 4.1.10 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:5:10 (1cement : 5coarse sand : 10 graded stone aggregate 40mm nominal size) | 397 | cum |
6 Days Left