Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: University Of Jammu
Tender ID4351878
Organisation NameUniversity Of Jammu
Tender BriefCorrigendum : Providing And Fixing Of Barbed Wired Fencing On Front Side Of Imfa Building At Poonch House University Of Jammu
Last Date For Submission10th Jun, 2026
Opening Date12 Jun, 2026
Cost
Document Cost708.00
EMD3225.00
Estimated Cost0.00
Location
CityPoonch
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kind of soils.11.78Cum
2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size).1.94Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).11.78Cum
4Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns.12.76Sqm
5Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire.595.6Rmt