Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pradhan Mantri Gram Sadak Yojana
Tender ID3900628
Organisation NamePradhan Mantri Gram Sadak Yojana
Tender BriefCorrigendum : Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Poonch On Emergency Basis I.e. (motorable Paths Only) By Way Of Clearance Of Snow/slips/crates Works Likely To Occur During Financial Year 2026-27 (batch-9)
Last Date For Submission13th Apr, 2026
Opening Date15 Apr, 2026
Cost
Document Cost600.00
EMD16500.00
Estimated Cost0.00
Location
CityPoonch
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201 Girth above 300 mm to 600 mm1.000No.
2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : 1.000Cum
3Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.2 Ordinary Rock 1.000Cum
4Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.Hard Rock (Blasting Prohibited)1.000Cum
5Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil :1.000Cum
13th Apr, 2026

2 Days Left

WhatsApp