Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3900629 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Corrigendum : Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Poonch On Emergency Basis I.e. (motorable Paths Only) By Way Of Clearance Of Snow/slips/crates Works Likely To Occur During Financial Year 2026-27 (batch-8) |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 18000.00 |
| Estimated Cost | 0.00 |
| City | Poonch |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201 Girth above 300 mm to 600 mm | 1.000 | No. |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | 1.000 | Cum |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.2 Ordinary Rock | 1.000 | Cum |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.Hard Rock (Blasting Prohibited) | 1.000 | Cum |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 1.000 | Cum |
2 Days Left