Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4409919 |
|---|---|
| Organisation Name | Purvanchal Vidyut Vitaran Nigam Limited |
| Tender Brief | Corrigendum : Civil Rectification And Strengthening Work Of Control Room Building At 33/11 Kv Substation-udaiadih And Haripur Bardaita, Pratapgarh. |
| Last Date For Submission | 18th Jun, 2026 |
| Opening Date | 19 Jun, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 15500.00 |
| Estimated Cost | 751596.00 |
| City | Prayagraj |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 400.24 | Sqm. |
| 2 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 71.12 | Sqm. |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead Of area 3 sq. metres and below | 8.00 | each |
| 4 | 12 MM Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement.. | 215.60 | Sqm. |
| 5 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. For the purpose of measurement the entire treated surface will be measured. | 215.60 | Sqm. |
Ending Today