| 2 | Survey (GIS-based), soil investigation, Engineering, Design (hydraulic, electro-mechanical and structural) as per requirement, vetting of design drawing by any IIT/NIT or Govt. Engineering Institute, procurement of all labour & material, T&P, etc. for completion of various component Interception and Diversion work of 02 No. existing drains, conveyance system, discharge measurement of both drains and establishment of a Centralised 1000 KLD Sewage Treatment Plant based on open / poven technology, inclusive of ensuring the final effluent parameter strictly complies with the National Green Tribunal (NGT) latest norms & guidelines. The cost includes the cost of Civil, E&M and instrumental work, suitable foundation/arrangements for I&D, conveyance system up to STP, Construction of STP, with inlet chamber/collection tank, raw sewage pumping system as per requirement, pre-treatment units (like screening/grit removal etc.-including one stand-by unit), Primary/Secondary Treatments, Disinfection, Disposal of treated sewage by gravity/pumping, Sludge Thickening(if required), Sludge dewatering units with necessary piping work with valves, gates, drains, pathways etc. all complete as turn-key Job as per the vetted design/drawing. The STP shall also have a flow measuring system at the inlet, outlet and bypass with required instrumentations. The cost shall also include obtaining power connections from UPPCL, SITC of required DG sets/ Electric Substation/Transformers and foundation/ pumps and HT/LT/Control Panels, Laboratory with equipment to test and monitor parameters of raw/treated sewage, Meter room as per requirement of UPPCL, Construction of administrative building cum control room cum Lab, boundary wall 1.5 m high with main gate wicket gate & other required buildings and disposal of treated effluent, all other associated works at Sirathu Nagar Panchayat, District Kaushambi, U.P, India. The scope of work includes successful testing & trial-run for 3 months, commissioning & handing over all works to the concerned department/ULB, also including defect liability period of 12 months for Civil works & 24 months for E/M works, etc., all civil/E/M complete as per the latest guidelines and relevant IS codes/manual and considering HFL of th STP Site. | 1 | Nos |
| 4 | Construction of RCC drain, including survey design/drawing, its vetting from any IIT/NIT or other Govt. Engineering Institute, supply of all labour, material and T&P etc to complete the construction of the RCC drain of the required section ( Minimum Section Size 1.20 m X 1.20 m,Minimum Hieght 0.30 M of drain should be aboveFrom Existing NGLAlong Full lenght ) and proper slope and its commissioning and handing over it to concern dept/ULB etc, complete as per the latest guidelines and relevant IS codes/manual. | 1900 | RMT |