Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4982360 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/maintenance Of Building Security Light With Miscellaneous Items At New Cantt Prayagraj |
| Last Date For Submission | 13th Aug, 2026 |
| Opening Date | 20 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 99980.00 |
| Estimated Cost | 4999000.00 |
| City | Prayagraj |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Disconnecting and dismentling of damaged/unserviceable cable any type/make, supply & laying (in repair) cable PVC insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor using lugs/ferrul bothe end of cable and testing for size 10 Sqmm, 2 Core complete all as specified and directed | 1200.00 | RM |
| 2 | Descripiton same all as per item No 1 here-in-before but size 16 Sqmm, 4 Core | 400.00 | RM |
| 3 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth, getting out for electric cable complete in any type of soil complete all as specified and directed Note - (i) Excavation & earth work, sand cushioning, bricks protection & GI pipe where required shall be measured & paid seperately. (ii) For the digging of soil, JCB machine will not be allowed at site, it will be done by labour only and contractor will be responsibleto repair the existing cable, PCC plinth etc without extra cost which will be damaged during execution of wk. | 302.40 | Cum |
| 4 | Removing surplus excavated soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above starting point complete all as specified and directed. | 127.88 | Cum |
| 5 | Returning, filling in, soil obtained from excavation including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick complete all as specified and directed. | 174.52 | Cum |
6 Days Left