| Tender ID | 4339513 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road Inside Unit Area At Old Cantt Under Ge (east) Prayagraj. |
| Last Date For Submission | 26th Jun, 2026 |
| Opening Date | 03 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 204260.00 |
| Estimated Cost | 12926000.00 |
| City | Prayagraj |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and not excceding 50 mm deep, complete all as specified and directed. | 382.05 | X Sqm |
| 2 | Screening road metal, Chippings, etc. on the site of the work, when specially ordered, including removing screened materials clear of screen and stacking in separate heaps for measuring (Materials from both sides of screen measured), complete all as specified and directed. | 28.65 | Cum |
| 3 | M&L for 150 mm thick thick (compacted thickness) WBM in two layer (75 mm thick each layer ), with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated with 8 to 12 tonne power roller to required gradient ,camber and super elevation required complete all as specified and directed. Note:- Each layer shall be laid and rolled separately. | 402.63 | X Sqm |
| 4 | Labour Only (except coarse aggregate material) 75 mm thick (compacted thickness) WBM, with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated with 8 to 12 tonne power roller to required gradient ,camber and super elevation required complete all as specified and directed. Note:-Coarse aggregate shall be reused as obtained from item No-1 & 2. | 43.50 | X Sqm |
| 5 | M&L for rolling and consolidering the formation surface of earthing road and providing 150 mm thick soiling(spread thickness) with broken boulders or quarried stone,interstices filled,surface formed,rolled and consolidated to required gradient and camber with 8 to 10 tonne power roller complete all as specified and directed. | 64.08 | X Sqm |