Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Jal Nigam
Tender ID4327279
Organisation NameUttar Pradesh Jal Nigam
Tender BriefCorrigendum : Used Water Management Project In Hathgaon Np District Fatehpur Under Sbm 2.0 Programme
Last Date For Submission25th Jun, 2026
Opening Date25 Jun, 2026
Cost
Document Cost11800.00
EMD427000.00
Estimated Cost21326000.00
Location
CityPrayagraj
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Used Water Management Progect in Hathgoan NP, District - Fatehpur under SBM (U) 2.0 Programme.
2Survey, Design, Procurement & Conducting a GIS-based survey and soil investigation. Performing necessary hydraulic and structural engineering and design. Procuringall required labor, materials, and Tools & Plants (T&P) for Network and Treatment Facilities. Executing Interception and Diversion (I&D) works for all existing drains and establishing a conveyance network. Establishing Centralized/ De-centralized Sewage Treatment Plant(s) (STP) based on open technology including a 4 KLD Co-Treatment facility specifically for Fecal Sludge/Septage.Constructing Civil, Electrical & Mechanical (E&M), and instrumentation works with suitable foundations for the I&D, conveyance network, and STP(s). Building STP components including an inlet chamber, pre-treatment units components including an inlet chamber, pre-treatment units (including one standby unit), Primary/Secondary Treatments, and Disinfection units. Setting up Sludge Thickening and Sludge dewatering units ensuring the final treated effluent strictly complies with the latest National Green Tribunal (NGT) guidelines (BOD<10mg/l, TSS<20mg/l, Nitrogen-Total <10mg/l, Total Phosphorus <1mg/l, Fecal coliform<100 MPN & COD<50mg/l).Executing necessary piping work including valves, gates, drains, and pathways. Setting up mechanisms for the disposal of treated sewage and effluent by gravity/ pumping. Constructing an Administrative building cum Laboratory cum Store room, and a SCADA & Meter room. Erecting a 1.8 m high boundary wall equipped with a main gate, wicket gate, and other required buildings. Electrical, Instrumentation, and Automation Installing flow meters at the inlet, outlet, and bypass, alongside level sensors.Implementing PLC/SCADA Automation and required instrumentation. Setting up IP-based CCTV for monitoring during the construction and Operation & Maintenance (O&M) periods. Providing necessary power infrastructure, including DG sets, an Electric Substation, Transformers with foundations, pumps, and Control Panels. Testing,Commissioning, and Handover Completing successful testing, commissioning, and a 3-month trial run of the facilities. Handing over all completed works to the concerned department/Urban Local Body (ULB). Coveringa defect liability period of 12 months for Civil works and 24 months for E&M works.1Nos
25th Jun, 2026

9 Days Left

WhatsApp