Tendering Authority: Public Works Department
Tender ID4786887
Organisation NamePublic Works Department
Tender BriefCorrigendum : Establishment Of Pasteurized Compost Making Unit (capacity 35 Mt) At Newly Alloted State Land Kakapora, District Pulwama (public Sectro) Under Hadp Project Promotion Of Round The Year Mushroom Cultivation 2025-26 (electro-mechanical Part)
Last Date For Submission22nd Jul, 2026
Opening Date23 Jul, 2026
Cost
Document Cost1100.00
EMD50660.00
Estimated Cost2533000.00
Location
CityPulwama
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply, Installation, Testing and Commissioning of Blowers with blower capacity 1200 CFM against static pressure of atleast 200 mmwg with automatic control panel that includes motor starter and single phase preventor of suitable type and timer to control the run time of the blower as per the phase 1 composting requirements plus other controls necessary for the process. The job also includes connecting the blower to the main circulation GI ducts and then with the HDPE/PVC pipes laid in the bunker floor complete with necessary fittings like elbows, sockets, isolation valves as per site requirements. Suitable dampers at the discharge end also need to be provided for isolation purpose. The job also includes laying of suitable cable as recommended for the motor from the main panel to the blower/control panel in suitably sized PVC conduits to be fixed on the floor/wall as per site conditions. Further, the job includes construction of concrete pedestal for mounting of the blower and canopy of suitable size. The job is inclusive of the cost on account of material, labour, and all tools and tackles required for the completion of the job. (1 standby). The job also includes the construction of RCC padestal (dimensions as per blower size and base plate requirement with the height of 3ft min from floor ) to elevate, securely mount and fasten the blowers.3.00Job
2Supply, Installation, Testing and Commissioning of belt driven blower with motor, blower capacity 7500 CFM against static pressure of atleast 200 mmwg, impeller size not less than 18 , one number automatic control panel that includes motor starter (fully automatic) of suitable type, single phase preventor, timer for fan operation, automatic damper actuator that controls the damper opening with respect to the tunnel temperature, damper for fresh air supply and other controls required for Phase 2 composting process. The job also inlcudes the cutting of suitable window at the top of the tunnel for connection with the blower for recirculation of inside air. The job also includes providing and fitting of elbow duct with air filters (HEPA) for fresh air inlet and connecting the blower with the plenum chamber of the pasteurization tunnel. The job also includes laying of suitable cable as recommended for the motor from the main panel to the blower/control panel in suitably sized PVC conduits to be fixed on the floor/wall as per site conditions. Further, the job includes construction of concrete pedestal for mounting of the blower and canopy of suitable size. The job is inclusive of the cost on account of material, labour, and all tools and tackles required for the completion of the job. (1 standby). The job also includes the construction of RCC padestal (dimensions as per blower size and base plate requirement with the height of 3ft min from floor ) to elevate, securely mount and fasten the blowers.2.00Job
3Supply, Installation, Testing and Commissioning of Microprocessor/PLC based Temperature, Humidity control system. Complete job including hardware,((Minimum 3 Sensors each (Industrial Grade, suitable for harsh environment)),electric fitting, required for the successful completion of the job. The sensors so installed shall enable the blowers to regulate their operation as per the process requirements with respect to damper opening, run time of blowers etc. The controller must be capable of processing inputs from high accuracy temperature and humidity sensors. the controller shall support advance communication protocols. All components shall be industrial grade. The complete job includes cost of material, labour, tools and tackles reqd for completion of job and taxes.1.00No
4AIR DISTRIBUTION RECTANGULAR GI DUCT FACTORY MADE GSS Ducting: Supplying fabrication installation testing and commissioning of GI. Sheet metal ducting. Zinc coated. Complete with all Standard Accessories, G.I.. Hardware, Self Adhesive elastomeric foam gasket, support etc as per SMACNA specification. Sheet Thickness - 1.00 mm30.00Sqm
5SITC of Air Outlets and Dampers Aluminium volume control dampers as required.2.00Job
22nd Jul, 2026

7 Days Left