| Tender ID | 3932566 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Damage To Sonbanjar Bagandar Bridge On Hakdiyagi Nallah |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 1600.00 |
|---|---|
| EMD | 115020.00 |
| Estimated Cost | 5751000.00 |
| City | Pulwama |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 378.300 | cum |
| 2 | supply and hand packing stones in wire crates 100x 100 mm mesh (woven diagonally) of thickness 4 mm incld laying of crates in proper position binding top after filling of stones incld carrige of crates and stone with loading and unloading complete incld cost of crates royalty complete job Nallah stone | 1541.700 | cum |
| 3 | Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:2:4 (1cement: 2 fine sand: 4 graded stone aggregate 20mm nominal size)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete. | 52.540 | cum |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 157.500 | sqm |
| 5 | Providing and laying in postion spacified grade of reinforced cement concrete excluding the cost of centering, shuttering,finishing and reinforcement All work upto plinth level 1:1.5:3 (1cement:1.5 coarse sand: 3 graded stone aggregate 20mm nominal ize)(Crushed). Including carriage of all materials involved with loading unloading and stacking complete. | 23.630 | cum |